>  Term: Power ascension
Power ascension

The period of time between a plant's initial fuel loading date and its date of first commercial operation (including the low-power testing period). Plants in the first operating cycle (the time from initial fuel loading to the first refueling), which lasts approximately 2 years, operate at an average capacity factor of about 40 percent.

0 0

작성자

  • Harry8L
  • (London, United Kingdom)

  •  (V.I.P) 574128 포인트
  • 100% positive feedback
© 2025 CSOFT International, Ltd.