>  Term: valid-to date
valid-to date

The end of the period of validity or effectivity of an object, such as a BOM or routing, in the production planning system.

0 0

작성자

  • Kristen
  •  (Silver) 643 포인트
  • 100% positive feedback
© 2024 CSOFT International, Ltd.