>  Term: production lead time
production lead time

The time interval between the placement of a contract and receipt into the supply system of materiel purchased. Two entries are provided: a. Initial — The time interval if the item is not under production as of the date of contract placement; and b. Reorder — The time interval if the item is under production as of the date of contract placement.

0 0

작성자

  • Lucrezia
  •  (Gold) 3125 포인트
  • 100% positive feedback
© 2024 CSOFT International, Ltd.