홈 > Term: movement schedule
movement schedule
A schedule developed to monitor or track a separate entity, whether it is a force requirement, cargo or personnel increment, or lift asset. The schedule reflects the assignment of specific lift resources (such as an aircraft or ship) that will be used to move the personnel and cargo included in a specific movement increment. Arrival and departure times at ports of embarkation, etc. , are detailed to show a flow and workload at each location. Movement schedules are detailed enough to support plan implementation.
0
작성자
- Lucrezia
- 100% positive feedback