>  Term: design-to-cost
design-to-cost

An approach to managing a system/software project to hold the project to a predetermined cost. Actual and projected costs are closely tracked, and actions such as deleting or postponing lower-priority requirements are taken if costs threaten to exceed targets. Also called cost as an independent variable (CAIV).

0 0

작성자

  • artemis
  •  (Gold) 1356 포인트
  • 100% positive feedback
© 2024 CSOFT International, Ltd.