>  Term: available but not needed capability
available but not needed capability

Net capability of main generating units that are operable but not considered necessary to carry load and cannot be connected to load within 30 minutes.

0 0

작성자

  • Pud6
  •  (Gold) 2324 포인트
  • 100% positive feedback
© 2025 CSOFT International, Ltd.