홈 > Term: D-day materiel readiness gross capability
D-day materiel readiness gross capability
As applied to the D-to-P concept, this capability represents the sum of all assets on hand on D-day and the gross production capability (funded and unfunded) between D-day and P-day. When this capability equals the D-to-P materiel readiness gross requirement, requirements and capabilities are in balance.
0
작성자
- Lucrezia
- 100% positive feedback